In the modern industrial system, bearings are the core components of rotating equipment, and towers are key equipment for new energy wind power.
Chaoyang Heavy Machinery Co., Ltd., a long-established heavy equipment manufacturing enterprise located in Chaoyang, is pursuing the high-quality development “Chaoyang Heavy Machinery Speed” on the new energy equipment manufacturing track with a high-spirited attitude of “starting at the beginning of the year and sprinting at the beginning”.

In spring, the Chaozhong wind power tower production workshop is a bustling scene.
Machines roared, welding flowers spattered, and all production lines were running at full speed.
The workers performed their duties and cooperated tacitly in cutting, welding, grinding and other positions. The site was in order and everyone was very motivated.
During the Spring Festival holiday, the workshop production line never stopped, and front-line employees stuck to their posts and worked hard to produce. After the holiday, all employees quickly returned to work, achieving a dual-line acceleration of resumption of work and production and improvement of quality and efficiency, laying a solid foundation for the development throughout the year.
“Not stopping work during the holidays and returning to work soon after the holidays is to seize the development opportunities of the new energy industry and ensure that production and operation in the first quarter get off to a good start.” said the person in charge of the production department of the enterprise.
With the “Three Mornings” layout of “early planning, early deployment, and early action”, Chaozhong formulated a non-stop production plan before the holiday, scientifically optimized team scheduling, coordinated raw material supply, refined production plans, optimized production processes, and strictly adhered to quality standards throughout the entire process from raw material inspection, processing and manufacturing to finished product acceptance, effectively ensuring the efficient and stable operation of the workshop.

Adhering to the concept of “the production rhythm will not be relaxed, the project progress will not be reduced, and the product quality will not be reduced”, we will pay close attention to production organization and quality control.
In the first quarter, the company’s wind power tower orders reached 25,000 tons, production orders were fully booked, and development momentum was strong.
The heart-warming logistics support unites the joint efforts of all employees, allowing employees to have no worries and devote themselves to production, ensuring that production capacity is reached through hard work.
Orders are the basis for development.
Seizing the development trend of the new energy industry, Chaozhong established a market attack team in advance, proactively visited customers, docked key wind power projects, and accurately grasped market demand.
Relying on its strong industry reputation, exquisite manufacturing technology, and reliable product quality, the company has successfully won a large number of high-quality orders, further consolidating its market position in the field of wind power tower manufacturing.
The relevant person in charge of Chaozhong said that in the next step, the company will continue to optimize the production process, improve production efficiency, deepen market segments, expand sales channels, use more practical measures to achieve the annual goal, strive to build a domestic first-class wind power tower manufacturing base, and contribute “Chaozhong’s strength” to the high-quality development of the local new energy industry.